I found this on a thread at another forum:
I tried this in Visual Basic 2008 Express, and I didn't even need to manually copy any files. I started with Add Existing Item, navigated to the other project (which was in a different solution), highlighted the full set of files for the form I wanted to copy (multiple select using SHFT), clicked on the Add dropdown, and selected "Add" rather than Add as Link". The files were copied from the old to the new project, and the form was fully functional right away.
But when I tried this I got a message saying:
Attachment 99081
This looks like a neat method of copying existing work but I don't see where they mentioned renaming files, etc... Is there some way to make this actually work?
Quote:
I tried this in Visual Basic 2008 Express, and I didn't even need to manually copy any files. I started with Add Existing Item, navigated to the other project (which was in a different solution), highlighted the full set of files for the form I wanted to copy (multiple select using SHFT), clicked on the Add dropdown, and selected "Add" rather than Add as Link". The files were copied from the old to the new project, and the form was fully functional right away.
Attachment 99081
This looks like a neat method of copying existing work but I don't see where they mentioned renaming files, etc... Is there some way to make this actually work?